Harvey Norman

Location:
Christchurch
Length:
69m
Width:
39m
Knee Height:
8m
Floor Area:
2706m2
Building Use:
Warehousing
Cladding:
Precast concrete, JamesHardie™, Trimrib
Portal System:
DonoBeam
Time to Build:
8 months
Features:
The concrete slab is reinforced with armored steel joints to bear the weight of freight trucks and heavy machinery.

 

Coresteel Christchurch recently completed a purpose-built distribution warehouse that services Harvey Norman stores and provides customers with a central location to pick up big-ticket items.

The new distribution centre construction in Hornby consolidated three existing warehouses and was designed specifically for the company’s needs, including precise inward goods truck movements and a unique racking layout.

Precise timing was critical for the renowned retail company, which needed construction fast-tracked due to impending lease expiration.

Coresteel Christchurch’s tailored steel buildings and skilled warehouse builders were the selling points. Our dedicated project team responded by staying connected with the client, consultants, and contractors from start to finish to ensure the timeline advanced without delays.

Ready to start your next project?