Ali Arc Logistics
- Location:
- Palmerston North
- Length:
- 84m
- Width:
- 50m
- Knee Height:
- 7.6m
- Floor Area:
- 3850m2
- Building Use:
- Warehousing
- Cladding:
- 165mm thick precast walls to one side and end, Colorsteel Maxx roof and walls
- Portal System:
- DonoBeam
- Time to Build:
- 18 weeks
- Features:
- Bulk food storage facility
Gallery
Client testimonial
“Thanks to Geoff and his team for giving us a great building. From design to completion the process was seamless. It was a large build with heaps of precast which turned out really well, and how the beams and supports were constructed was impressive. We will certainly consider Coresteel for our next project which could be 2-3 years away and even larger. ”
Robert Bartley, Bartley Group Holdings Ltd, Ali Arc Logistics, Palmerston North