Glenorchy Helicopters
- Location:
- Frankton Central Otago
- Length:
- 30m
- Width:
- 26m
- Knee Height:
- 6m
- Floor Area:
- 780m2
- Building Use:
- Hangar
- Cladding:
- Trimrib Colorsteel
- Portal System:
- Bracketless Portal System
- Time to Build:
- 7 months
- Features:
- This build provided the customer with a hanger big enough to store all their machines, whilst also providing room for maintenance in the same area. It features an internal monorail for the lifting of helicopter motors.